Pasture Establishment guidance notes
As follows are only very brief notes on how best to establish one of our pasture mixtures.
The following assumes that you are establishing a new ley.
Soil testing
It is important to soil test to determine PH and soil fertility levels. Ideally this wants to be done about 8 months before planting. We can now offer a new soil testing service.
Lime & Fertiliser
Apply lime and fertiliser according to the results obtained. Lime should be applied 6 months prior to planting. Fertiliser can be applied at planting time.
Prepare a good seedbed
Grass mixtures require a well prepared and firm seedbed. Finely worked seedbeds allow good soil to seed contact. Work should be done to remove as much competition and weeds as possible.
Choose appropriate mixture
We stock a wide range of general and specialist ley mixtures, If there is a particular mixture you would like to sow that we do not stock we would welcome the opportunity to quote you a price on it.
Planting
The seed can be drilled or broadcast. This should ideally be done in April through to May or in August through to September. After drilling or broadcasting rolling should consolidate the ground.
Maintenance
A newly seeded pasture should ideally not be grazed until the plants have reached about 8 inches. Then they should only be grazed lightly to begin with.